The Obelisk Project
August-September 1999
continued

Photo credits: B. Wormington, J. Wormington.


The obelisk is almost at the requisite 75 degree angle.


The gauge on the side of the obelisk that gives the angle of tilt. Al Anderson steps over the rigging.


The base of the obelisk inside the sand pit as the sand exits.


Al's favorite health food. Right: Stone mason Roger Hopkins.


Andy Smith and another very tired and dusty worker.


Exhausted recruits.


At day's end.

BACK NEXT

Download Free MoviesDownload movies and watch them on iPodfree movies downloadfree thriller movieswar moviesfreemovies
line

PO Box 295, Alstead, NH 03602-0295     Phone and fax: 888-453-0879 (toll-free)

Home | About Our Site | Calendar | Conferences | FAQs | Helpful Links | Learn More | Membership | Members Only | New Visitors Tour | News | Online Store | Privacy Policy | Projects | Publications | Resources | Timber Frame Forums | Who We Are | Workshops

Copyright © 1997-2010 Timber Framers Guild. All rights reserved. Revised 02/2010.
Executive Directors
Will Beemer
MA 413-623-9926
Joel McCarty
NH 559-834-8453
line